{"id":828,"date":"2026-07-16T11:35:31","date_gmt":"2026-07-16T11:35:31","guid":{"rendered":"https:\/\/autosmarts.co\/en\/library\/ev-charging-infrastructure-checklist\/"},"modified":"2026-10-14T15:31:33","modified_gmt":"2026-10-14T15:31:33","slug":"ev-charging-infrastructure-checklist","status":"publish","type":"libraries","link":"https:\/\/autosmarts.co\/en\/library\/ev-charging-infrastructure-checklist\/","title":{"rendered":"EV Charging Infrastructure Checklist"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">What this checklist covers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The EV Charging Infrastructure Checklist is a 15-point scorecard for charger availability, installation safety, cable condition, load capacity, signage, access control, and maintenance records. Each criterion is scored from 1 to 5 on what the auditor sees on the day, and every gap goes into an action plan with an owner and a close date.<\/p>\n\n\n\n<p class=\"as-chktip wp-block-paragraph\"><strong>AutoSmart tip:<\/strong> EV charging infrastructure audits should include a live functional test \u2014 connect a compatible test vehicle or charging adaptor and verify the charger initialises, communicates the correct power level, and completes a charging session cleanly. A charger that shows &#8216;Available&#8217; on its display but fails to initiate a session is a common failure that is invisible without a functional test.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The checks<\/h2>\n\n\n\n<div class=\"wp-block-group as-checks is-layout-flow wp-block-group-is-layout-flow\"><p class=\"as-checks__note\"><span>Tap Yes, No or Maybe to try it: your answers stay in this page and clear when you refresh. For a detailed walkthrough, <a href=\"#get-pdf\">download our PDF<\/a> or <a href=\"https:\/\/autosmarts.co\/en\/book-a-demo\/\" data-as-track=\"demo\">book a demo<\/a>.<\/span><\/p>\n<div class=\"wp-block-group as-checksec is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Charger availability and type<\/h3><p class=\"as-checksec__meta\">4 checks<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">01<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is at least one operational EV charger available at the dealership for customer use, appropriate for the EV models sold and serviced?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">02<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Does the charger type (AC Level 2, DC fast charger) and connector standard (Type 2, CCS, CHAdeMO) match the charging requirements of the EV models sold at the dealership?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">03<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is the charging power output (kW rating) sufficient to provide a meaningful charge for a customer visiting for service, within a typical service visit duration?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">04<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Are chargers for internal workshop use (topping up service vehicles, EVs awaiting delivery) separate from customer-facing chargers, to prevent customer charging points being consumed by internal use?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-group as-checksec is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Installation safety and load capacity<\/h3><p class=\"as-checksec__meta\">4 checks<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">05<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Was the EV charging installation carried out by a qualified electrician, with a completion certificate and electrical installation condition report (or equivalent) on file?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">06<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is the facility&#039;s electrical supply confirmed as adequate for the total EV charging load, with no risk of overloading the supply or tripping protection equipment under normal use?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">07<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Are RCD (residual current device) or equivalent earth fault protection devices installed on EV charging circuits, functional, and tested at the required interval?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">08<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is earthing and bonding on the EV charging installation compliant with local electrical standards, confirmed in the installation certificate?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-group as-checksec is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Cable condition and signage<\/h3><p class=\"as-checksec__meta\">3 checks<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">09<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Are EV charging cables inspected regularly for damage \u2014 cuts, fraying, exposed conductors, damaged connector housings \u2014 with damaged cables removed from service immediately?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">10<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Are charging bays clearly signed with EV charging identification, permitted connector types, and any usage restrictions (maximum session time, authorised users only)?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">11<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Are charger status indicators (available, in use, fault) functional and visible to approaching users, reducing unnecessary approach to an unavailable unit?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-group as-checksec is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Access control and maintenance records<\/h3><p class=\"as-checksec__meta\">4 checks<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">12<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is access to EV charging points managed to prevent non-customer or non-authorised use, particularly for fast chargers with a queuing risk?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">13<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is a maintenance schedule in place for EV chargers, covering software updates, connector wear checks, and electrical system inspection at defined intervals?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">14<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is a fault log maintained for EV chargers, with faults reported promptly to the charger operator or manufacturer and downtime minimised?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n\n\n\n<li class=\"as-check\"><span class=\"as-check__no\" aria-hidden=\"true\">15<\/span><span class=\"as-check__body\"><span class=\"as-check__text\">Is charger availability (uptime percentage) tracked, with persistent downtime investigated and resolved rather than accepted as background unavailability?<\/span><span class=\"as-check__answer\" role=\"group\" aria-label=\"Your answer\" hidden><button type=\"button\" data-answer=\"yes\" aria-pressed=\"false\">Yes<\/button><button type=\"button\" data-answer=\"no\" aria-pressed=\"false\">No<\/button><button type=\"button\" data-answer=\"maybe\" aria-pressed=\"false\">Maybe<\/button><\/span><\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Covers charger availability, charger type, installation safety, cable condition, load capacity, signage, access control, and maintenance records.<\/p>\n","protected":false},"template":"","meta":{"footnotes":"","_as_roles":"","_as_frequency":"","_as_standard":"","_as_source":"","_as_pdf":1057,"_as_solution":556,"_as_guide":0,"_as_case_study":0,"_as_lib_featured":false},"industry_tag":[3],"checklist_topic":[22],"checklist_market":[],"class_list":["post-828","libraries","type-libraries","status-publish","hentry","checklist_topic-ev-readiness"],"_links":{"self":[{"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/libraries\/828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/libraries"}],"about":[{"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/types\/libraries"}],"version-history":[{"count":3,"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/libraries\/828\/revisions"}],"predecessor-version":[{"id":1305,"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/libraries\/828\/revisions\/1305"}],"wp:attachment":[{"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/media?parent=828"}],"wp:term":[{"taxonomy":"industry_tag","embeddable":true,"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/industry_tag?post=828"},{"taxonomy":"checklist_topic","embeddable":true,"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/checklist_topic?post=828"},{"taxonomy":"checklist_market","embeddable":true,"href":"https:\/\/autosmarts.co\/en\/wp-json\/wp\/v2\/checklist_market?post=828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}